Which term describes a series of tests performed on fire protection, detection, and/or suppression systems to verify operational readiness? These tests should be performed at least yearly or whenever the system has undergone extensive repair or modification.

Explanation:
Ongoing readiness of fire protection, detection, and suppression systems is confirmed through service testing, a scheduled set of tests performed after maintenance or extensive repair to verify that all functions operate correctly. These checks are performed at least yearly and anytime significant work has been done, ensuring that alarms, controls, pumps, valves, and interlocks respond as intended in an actual fire scenario. This differs from an acceptance test, which is done before a system is placed into service to prove it meets design and code requirements; commissioning is a broader, initial process to verify that all parts work together as designed; a verification test is a general term for confirming results but does not specifically denote the ongoing post-service checks that ensure ongoing readiness.

Ongoing readiness of fire protection, detection, and suppression systems is confirmed through service testing, a scheduled set of tests performed after maintenance or extensive repair to verify that all functions operate correctly. These checks are performed at least yearly and anytime significant work has been done, ensuring that alarms, controls, pumps, valves, and interlocks respond as intended in an actual fire scenario. This differs from an acceptance test, which is done before a system is placed into service to prove it meets design and code requirements; commissioning is a broader, initial process to verify that all parts work together as designed; a verification test is a general term for confirming results but does not specifically denote the ongoing post-service checks that ensure ongoing readiness.